| Name of the Project |
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Deoria village to Donoreshan village from km 253.000 to km 288.600 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (Package 10). |
| Client |
National Highways Authority of India, New Delhi. |
| Consultant |
Intercontinental Consultants and Technocrats Pvt. Ltd. |
| Concessionaire |
H.G. Varanasi-Kolkata Pkg-10 Highway Private Limited |
| Contractor |
HG Infra Engineering Limited |
| Date of Agreement |
28th June 2023 |
| Project stretch |
Starts from Deoria village (Design Ch 253+000) and Donoreshan village (Design Ch 288+600) |
| Total Length |
35.60 Km |
| Length of Service Road |
2.374 (LHS+RHS) |
| Length of Ramp Road |
4.466 (LHS+RHS) |
| Length of Cross Road |
0.800 (LHS+RHS) |
| Project Cost |
Rs. 1303.11 Cr. (excluding GST) |
| Appointed Date |
30th May 2026 |
| Construction Period |
24 months |
| O&M Period |
180 Months |
| Project Proposals |
|
| Proposed Right of Way |
70 Mtr.- in Non Forest Location & 60 Mtr.- in Forest Location |
| Proposed carriage way |
6-lane Greenfield with Perpetual Flexible pavement |